The Technical Committee of the Economic Commission has approved a proposal to transfer water from the Kunar River to the Darunta Dam reservoir.
This significant infrastructure project, designed to pass through the lower Gambiri desert, has now been referred to the main Economic Commission for a final decision and approval.
During the meeting held at the Office of the Deputy Prime Minister for Economic Affairs, the construction of the Badghis Ring Road was also a key topic.
Officials discussed the fifth section of this road, spanning 25 kilometers, which is crucial for improving regional connectivity and transportation networks.
A specific committee has been tasked with conducting a comprehensive review of the Badghis road project.
They are expected to present their detailed report at the next technical meeting, ensuring that all aspects are evaluated before the final steps are taken.